Water Resources Engineering Projects

Water Resources Engineering Projects2018-03-15T09:03:05+00:00
Flood Protection Structures D/S Mangla Reservoir, AJK
Supervision Of 15 No Small Dams In Dadu & Kohistan, Sindh
Installation of 250 Solar Tubewells in Nawabshah
Installation of 250 Solar Tubewells in Mirpurkhas
ADB Financed Flood Emergency Rehabilitation Project
Thar Coal Water Carrier Project, Sindh
Box Culvert , Thar Coal Water Carrier Project, Sindh
Raw Water Channel, Thar Coal Project, Sindh
Stone Pitching along Manchar Lake, Sindh
Installation of Sheet Piles along Monarki Bund, Sindh
Feasibility Study for Construction of Rain Water Dams along River Indus Sindh
Construction of Water Carrier with Capacity of 100 Cusecs form Spinal Drain to Nabisar
Boring and Installation 250 Tubewells on Solar Energy To Control The Water Table
Sr. No Name of the Project Cost of the Project (Million) Duration
1 Consultancy Services for Project Management Consultants (PMC) for Design, Construction Supervision and Management of ADB loan No. 2742/22743(Pak)SF: Flood Emergency Reconstruction Project (FERP), Sindh (Irrigation Component) 19,000 Dec 2011 –May 2013
2 Consultancy Services for Detailed Design, Construction Supervision & Contract Management of Water Carrier with Capacity of 100 Cusecs from Spinal Drain to Nabisar Depression for Thar Coal Power Generation Units 15,000 Nov 2012 – Sep  2014
3 Consultancy Services for Feasibility Study, Detailed Engineering Design and Preparation of PC-I for Construction of Rain Water Dams (Reservoirs) along River Indus in Sindh. 2,000 July 2013 – Mar 2014
4 Consultancy Services for Detailed Design and Construction Supervision of Boring & Installation of 250 Tubewells on Solar Energy to Control the Water Table in Different Districts of Sindh 2,125 Mar 2013 – Feb 2015
5 Consultancy Services for Detailed Design and Construction Supervision of Boring & Installation of 250 Tubewells on Solar Energy Assured Supply of 100 Cusecs for Thar Coal from LBOD Spinal Drain RD-362 1,985 Apr 2014 – Feb 2016
6 Consultancy Services for Feasibility Study and Detailed Design  for Construction of New Channel Twin Mithrao Canal 4,500 Nov 2007 –June  2008
7 Consultancy services for Detailed Design and Construction Supervision of Reconstruction of X-Regulator at Rd-45 B.S. Feeder canal 1,032 Dec 2013 – Nov 2014
8 Consultancy Services for Feasibility Study and Detailed Design for the Remodeling/ Extension of Khari Irrigation Canal & 8 Distributaries/ Minors Under Upper Jhelum Canal (UJC) 890 Feb  2012- Dec 2012
9 Consultancy Services for Feasibility Study, Detailed Design and Construction Supervision  for the Construction of Hajira To Tata Pani Water Channel District Poonch-AJK 670 July 2010 – Dec 2011
10 Consultancy Services for Pilot Project for Sealing of KB Feeder Canal by Polymer 650 Apr 2014 – Mar 2015
11 Consultancy Services for Feasibility Study and Detailed Design of River bank protection and land reclamation in Khari Sharif and adjoining areas of District Mirpur and Bhimbher-AJ&K 870 Nov 2008 – Feb  2009
12 Consultancy Services for  Feasibility Study & Detailed Design  of Sheringal Doadba Irrigation Scheme 456 May 2007- Mar 2008
13 Consultancy Services for Feasibility Study and Detailed Design of construction of bund on either side of the River Swat to prevent flooding of habitats in the vicinity 290 May 2007- Nov 2007
14 Consultancy services for Design Review, Construction Supervision and Monitoring the Construction of 07 No. Small Dams, Delay Action Dams, Detention Weirs and  I.S.S.O. Barrier in Lower Kohistan Region of Small Dams Division Kohistan-II, Jamshoro-Sindh 1,021 Feb 2012 –Jan 2015
15 Consultancy services for Design Review, Construction Supervision and Monitoring the Construction of 06 No. Small Dams, Delay Action Dams, Detention Weirs and  I.S.S.O. Barrier in Upper Kohistan Region of Small Dams Division Kohistan-I, Dadu-Sindh 875 Feb 2012 –Jan 2015
16 Consultancy services for Design Review, Construction Supervision and Monitoring the Construction of Malir Memon Goth Weir Across Malir Nadi in Lower Kohistan Under ADP Programme 421.36 June 2013 – May 2015
17 Consultancy services for construction of I.S.S.O. barrier dam across Rani Kot Nai including regulator in Central Kohistan-Sindh 120 July 2010 – June 2011
18 Consultancy services for construction of I.S.S.O. barrier dam across Bandhani in Central Kohistan-Sindh 100 July 2010 – June 2011
19 Consultancy services for construction of I.S.S.O. barrier dam across Taki Nai in Central Kohistan-Sindh 105 July 2010 – June 2011